Basement – bottom up

Temporary Works — Basement – bottom up projects.

Pinnacle


Dead shoring to existing 3 level basement to allow cutting of holes for piles up to 2.4m diameter and operation of a 130T piling rig at GF.

Read More

Quadrant 3 Regent Street


The project required the demolition of a 10 storey building plus 2 basements within part retained sections of facade, and excavation for a third level of basement.

Read More

Ropemaker Street


This major basement excavation 12-16m deep with a plan area 60m x 70m was required to support several new superstructure blocks up to 20 stories high.

Read More